September 01 4:00 AM
Route 2, 3, 4Routes 2, 3, 4: The stop at the airport has moved to the general public traffic lanes on the lower loop of Airport Way. The stop is located from pillar 14 to pillar 17 at the end of the arrivals pick up lanes
Routes 2, 3, 4: The stop at the airport has moved to the general public traffic lanes on the lower loop of Airport Way. The stop is located from pillar 14 to pillar 17 at the end of the arrivals pick up lanes
Route 45: detour The intersection of Idaho Ctr Blvd & Cherry Ln will be closed from 5/16/23 to 10/30/23 due to construction. The buses will detour from Idaho Ctr Blvd to Franklin Rd, then onto Black Cat Road to Cherry Ln. No stops will be missed.
Route 42 - Stop at Franklin & Robinson Rd SEC is closed due to construction. No Temp stop placed. Passengers can use the stop in front of Amazon listed as Franklin & Robinson Rd SWM.
Route 16 and 17: due to construction on both the 16 and 17 expect delays.
Route 17: the outbound stop on Warm Springs and Walnut is closed; temp stop placed 300' far side.
September 08 7:00 AM Route 16 and 17: due to construction on both the 16 and 17 expect delays.
September 22 12:00 AM Route 17: the outbound stop on Warm Springs and Walnut is closed; temp stop placed 300' far side.
September 22 6:00 AM Route 17: From 8-14-2023 to 12-8-2023 will be on detour all stops on warm springs between Ave C and Elm will be closed. No temps placed.