Arabic Arabic Chinese (Simplified) Chinese (Simplified) Dutch Dutch English English French French German German Italian Italian Portuguese Portuguese Russian Russian Spanish Spanish

March 26 12:00 AM

Route 6

Following four stops are closed: IB/OB Orchard and Cassia, IB Orchard and Peg, and OB Orchard and Ponder. Please use another stop.

March 27 4:00 AM

Route 9

Route 9 is on detour. Outbound: From 5th Street, Left Jefferson, right 8th, left State back on route. Inbound: From State, right 9th, left Jefferson, right 6th, right Idaho, left 9th, left Main to Main and 8th. No stops missed.

March 28 12:00 AM

Route 10

Route 10 is on detour. Outbound: From 5th Street, Left Jefferson, right 8th back on route. Inbound: From 9th, left Jefferson, right 6th, right Front, right Capitol, to Main Street Station. No stops missed.

March 28 12:00 AM

Route 16

Route 16 is on detour. Inbound: From 9th, left Jefferson, right 6th, right Front, right Capitol, to Main Street Station. No stops missed.

March 05 2:00 AM

Route 6

Outbound Route 6 at Orchard and Franklin stop is closed, placed temp stop in front of Gas station.

Home > Planning

Planning

Valley Regional Transit works with other stakeholders across the Treasure Valley to get more people to more places more often. To do this, service planning and capital planning are a constant priority. Service planning determines where public transit is provided. Capital planning builds and maintains the infrastructure for public transit.

Inside of a treasure valley bus

Capital Projects

How we’re building the future of transit in the Treasure Valley.

  • Fleet Electrification and Charging Infrastructure

    VRT has installed electric charging infrastructure at the Orchard Maintenance Facility. This infrastructure is the first step toward electrifying VRT’s fixed-route fleet. The first all-electric battery powered vehicles arrived in the spring of 2021. As of November 2022, VRT has 12 electric buses. VRT will take delivery of five additional buses in 2024 and eight buses (with overhead and depot chargers) in 2026 to complement our existing CNG fleet at the Orchard Facility.

  • Orchard Facility Master Plan

    The Orchard Street Maintenance facility is VRT’s main maintenance, parking, and staging facility for VRT. The facility was developed in the 1990’s and is in need of various upgrades. The Orchard Facility Master Plan (OFMP) will guide VRT in upgrading the Orchard facility to improve drainage, accommodate electric vehicles, and a larger fleet, and transition away from Compressed Natural Gas (CNG). VRT has started parking lot improvements, and drainage upgrades for the facility in summer 2022.

  • Main and Fairview Transit Island Project

    The Capital City Development Corporation (CCDC) worked with the City of Boise, the Ada County Highway District (ACHD) and VRT to reduce vehicle, bicycle and transit conflicts on Main and Fairview between Whitewater Park Boulevard and 17th Street. Transit islands in this corridor reduce conflicts between travelers and makes room for improved transit amenities in this quickly developing corridor. Work on the islands was completed in May 2022.

  • Bus Stop Improvements

    VRT is continuously addressing bus stops and transit locations based on ridership, physical conditions, and route needs. In 2020, The focus was to correct bus stop locations, which did not meet the standards for Americans with Disabilities (ADA), and to upgrade sites with high ridership. The second priority was to identify new stop locations for route changes in Canyon County and for expanded services to Eagle on the Route 9X line. Future projects will include replacing obsolete shelters, repairing concrete, and improving amenities (trash receptacles, bike racks, etc).

  • Bus Stop Typology Study & Kit of Parts Design Document

    This document introduces a strategy to enhance the bus stop experience and transit visibility. The new Kit of Parts document introduces new premium corridors with distinctive branding and enhanced amenities, defines methodologies and specifications for systemwide bus shelters and amenities, and includes graphics specifications to refresh bus stop signage.

    Learn more

Planning Projects

Bringing you the future of transit one step at a time.

  • 2023 Program of Projects

    The Program of Projects is a one-sheet reference guide outlining the fiscal year 2023 capital projects and program costs listed by county and includes funding sources and matching amounts. VRT is accepting public comments on the FY 2023 Program of Projects until April 17, 2023.

    Learn more
  • Transportation Development Plan

    VRT has adopted the 2023-2027 Transportation Development Plan (TDP), which serves as the five-year service and capital work plan for VRT. The TDP provides the opportunity for VRT to align priorities and investments in the region for the public transportation system.

    Learn more
  • Building a Better State Street Road Sign

    State Street Projects

    VRT is working with city, county and regional governments to develop a transit priority corridor on State Street. These investments are consistent with planning efforts that have occurred along the corridor such as the 2011 State Street Transit and Traffic Operations Plan. Current projects include the State Street Alternatives Analysis and the State Street Transit Operational Analysis. Additional information about these and other State Street projects can be found on The Build a Better State Street website.

    View the Build a Better State Street website
  • ValleyConnect 2.0

    ValleyConnect 2.0 contains VRT’s goals and policies for public transportation. It also identifies service and capital needs necessary to stay on track with the regions long range transportation plan. Taken together it is a plan to connect more people to more places with more frequent, faster service.

    Learn more

Bus Stop Design

When placing bus stops, VRT considers a variety of factors, including nearby destinations, accessibility, safety, and more.

Design Guidelines Checklist

Are you developing property and want or need to include a bus stop or upgrade the current bus stop as part of the plans?

Bus Service/Stop Application

Service Changes

Every year, Valley Regional Transit makes changes to maximize the effectiveness of existing transit resources and connect more people to more places more often.

Learn more

Planning Archives

Looking for a previous plan or project? Check out the Planning Archives.

Learn more