September 01 4:00 AM
Route 2, 3, 4Routes 2, 3, 4: The stop at the airport has moved to the general public traffic lanes on the lower loop of Airport Way. The stop is located from pillar 14 to pillar 17 at the end of the arrivals pick up lanes
Routes 2, 3, 4: The stop at the airport has moved to the general public traffic lanes on the lower loop of Airport Way. The stop is located from pillar 14 to pillar 17 at the end of the arrivals pick up lanes
Route 45: detour The intersection of Idaho Ctr Blvd & Cherry Ln will be closed from 5/16/23 to 10/30/23 due to construction. The buses will detour from Idaho Ctr Blvd to Franklin Rd, then onto Black Cat Road to Cherry Ln. No stops will be missed.
Route 42 - Stop at Franklin & Robinson Rd SEC is closed due to construction. No Temp stop placed. Passengers can use the stop in front of Amazon listed as Franklin & Robinson Rd SWM.
Route 16 and 17: due to construction on both the 16 and 17 expect delays.
Route 17: the outbound stop on Warm Springs and Walnut is closed; temp stop placed 300' far side.
September 07 6:00 AM Route 45: detour The intersection of Idaho Ctr Blvd & Cherry Ln will be closed from 5/16/23 to 10/30/23 due to construction. The buses will detour from Idaho Ctr Blvd to Franklin Rd, then onto Black Cat Road to Cherry Ln. No stops will be missed.